![]() |
| Home | Water Wells | Well Rehab | Geothermal | Environmental | Pump Systems | Equipment | Testimonials | Contact Us |
Pump Systems
Kuskanook Harbour ProjectThe Kuskanook Harbour Society manages Kuskanook Harbour, the first pay-per-launch marina after leaving Creston heading up the east shore of Kootenay Lake. In order to keep the marina ice free during the colder months, a propane powered air compressor had been used to aerate the harbour water. Daily costs to run the system averaged about $130. To find a more cost effective solution, the Kuskanook Harbour Society contacted Wild West Drilling to discuss alternative systems to keep the harbour ice free. After meeting with the directors on a couple of occasions to brainstorm ideas, Chris came up with a proposal for an underwater pump system. The proposed system was designed with safety in mind and had two intentions - to keep the harbour ice free and to bring in fresh water to help control weeds. Chris, his crew and several Kuskanook Harbour Society members installed the system in October 2010. Supply lines from the pump located just outside the harbour draws water into the harbour, branches into quadrants and water flows out five different outlets. Perforated pipes hung in suspension from the dock 18 inches into the water also keep water flowing. "It was a real pleasure to work with Kuskanook Harbour Society members, during both the brainstorming sessions and during implementation. Special thanks to members who volunteered their time during this project," says Chris Barling.
|
||||||||||||||||||||||||||||
| Water Wells • Pump Testing • Geo Thermal • Well Rehabilitation • Pump Installation • Tower Anchors • RC/Coring • Environmental • Certified for BC & AB • Commercial & Residential | ||||||||||||||||||||||||||||